Title 24 Commercial HVAC Testing In California

Title 24 Commercial HVAC Testing in California (mechanical acceptance testing) is a required step for verifying that commercial HVAC systems meet the state’s energy efficiency standards before final approval. Mechanical Acceptance Testing (MAT) may include Duct Leakage Testing, proper Ventilation Testing, and system controls testing. Whether for new construction, tenant improvements, or system upgrades, Title 24 HVAC testing ensures commercial buildings are operating efficiently, safely, and in accordance with state regulations.

We Service All Of California

Delo Air provides Title 24 commercial HVAC testing throughout Southern California and Northern California, supporting projects that require verified performance and energy code compliance. In Southern California, our services cover Los Angeles County, Orange County, Riverside County, San Bernardino County, San Diego County, Ventura County, Santa Barbara County, and Imperial County. In Northern California, we perform Title 24 HVAC testing across Alameda County, Contra Costa County, San Francisco County, San Mateo County, Santa Clara County, Sacramento County, Solano County, Sonoma County, Napa County, Marin County, and San Joaquin County. This statewide coverage allows contractors, owners, and developers to work with a single, consistent testing provider across multiple regions while keeping projects inspection-ready and on schedule.

CONTACT US

Title 24 Commercial HVAC Testing Services

Title 24 Commercial HVAC Testing Services verify that mechanical systems are installed, configured, and operating in accordance with California’s energy code requirements.

Certified title 24 commercial HVAC testing in California. Duct leakage testing, ventilation testing, and system controls testing.

Below are the primary NRCA acceptance tests we perform, each focused on confirming performance, efficiency, and proper control operation:

  • NRCA-MCH-02-A — Outdoor Air Acceptance
    Confirms required outside air quantities are delivered correctly for ventilation and indoor air quality.
  • NRCA-MCH-03-A — Constant Volume, Single Zone, Unitary Systems
    Verifies airflow, capacity, and controls for packaged and split AC and heat pump systems.
  • NRCA-MCH-04a-H — Air Distribution Duct Leakage (Hydronic)
    Tests duct systems associated with hydronic equipment to ensure leakage is within allowed limits.
  • NRCA-MCH-04b-A — Air Distribution Duct Leakage (Air Systems)
    Measures air duct leakage to confirm efficient air delivery and reduced energy loss.
  • NRCA-MCH-05-A — Air Economizer Controls Acceptance
    Verifies economizers operate correctly to use outdoor air for free cooling when conditions allow.
  • NRCA-MCH-06-A — Demand Control Ventilation Acceptance
    Confirms DCV systems adjust ventilation based on occupancy or CO₂ levels.
  • NRCA-MCH-07-A — Supply Fan Variable Flow Controls Acceptance
    Ensures variable-speed fans respond properly to load and control signals.
  • NRCA-MCH-08-A — Valve Leakage Test
    Verifies hydronic control valves fully close to prevent unwanted flow and energy waste.
  • NRCA-MCH-09-A — Supply Water Temperature Reset Controls Acceptance
    Confirms reset strategies adjust water temperature based on system demand.
  • NRCA-MCH-10-A — Hydronic Systems Variable Flow Control Acceptance
    Verifies pumps and controls modulate flow efficiently as loads change.
  • NRCA-MCH-11-A — Automatic Demand Shed Control Acceptance
    Confirms systems reduce load during peak demand events.
  • NRCA-MCH-12-A — FDD for Packaged DX Units
    Verifies fault detection and diagnostics identify common equipment issues.
  • NRCA-MCH-13-A — FDD for AHUs and Zone Terminal Units
    Confirms diagnostics properly detect faults in air handlers and terminal devices.
  • NRCA-MCH-14-A — Distribution Energy Storage DX AC Acceptance
    Verifies controls and operation for systems that store cooling energy.
  • NRCA-MCH-15-A — Thermal Energy Storage (TES) Acceptance
    Confirms TES systems charge, discharge, and control correctly.
  • NRCA-MCH-16-A — Supply Air Temperature Reset Controls Acceptance
    Verifies SAT reset sequences adjust temperatures to improve efficiency.
  • NRCA-MCH-17-A — Condenser Water Supply Temperature Reset Acceptance
    Confirms condenser water temperatures reset based on load and conditions.
  • NRCA-MCH-18-A — Energy Management Control System Acceptance
    Verifies EMCS points, sequences, and integration operate as designed.
  • NRCA-MCH-19-A — Occupied Standby Acceptance
    Confirms systems reduce energy use during occupied standby modes without compromising comfort.

These acceptance tests ensure systems are inspection-ready, energy-efficient, and compliant with Title 24 requirements.

Certified title 24 commercial HVAC testing in California. Duct leakage testing, ventilation testing, and system controls testing.

Additional Information About Title 24 Commercial HVAC Testing

Proper preparation helps ensure Title 24 commercial HVAC testing is completed efficiently and without inspection delays. Before testing is scheduled, make sure all HVAC systems are fully installed, powered, and commissioned according to the approved plans. Equipment such as rooftop units, air handlers, pumps, economizers, and control systems should be operational and free of active alarms or faults.

Access is also critical. Technicians must be able to reach rooftops, mechanical rooms, control panels, and valves, and all required components—such as sensors, dampers, actuators, and test ports—must be installed and identifiable. Control sequences should be programmed and functioning, since many Title 24 acceptance tests verify how systems respond under specific conditions. When systems are complete and accessible, testing can move forward smoothly, allowing NRCA forms to be completed and submitted without unnecessary re-visits.

No. Title 24 commercial HVAC testing in California must be performed by a certified and approved acceptance testing technician, not by the building owner, contractor, or installer. California energy code requires that mechanical acceptance testing be completed by an individual certified through an approved ATTCP (Acceptance Test Technician Certification Provider) to ensure the testing is independent, accurate, and code compliant.

These certified technicians are authorized to perform the required tests and complete the official NRCA forms that building departments and inspectors rely on for approval. Self-performing Title 24 testing or using unapproved personnel will result in rejected documentation and inspection delays. To keep projects moving forward, commercial HVAC Title 24 testing must be completed by a qualified, certified testing provider operating under California requirements.

After Title 24 commercial HVAC testing, NRCA forms are typically prepared and submitted within a short turnaround after testing is completed, often the same day or within one to two business days, depending on project size and the number of acceptance tests required. Once all required measurements are verified and results are confirmed to be within Title 24 requirements, the completed NRCA documentation is finalized and submitted to support inspection and project closeout. For larger or more complex projects, submission may take slightly longer to ensure accuracy, but clear timelines are always communicated upfront.

The duration of Title 24 commercial HVAC testing depends on the size of the building, system complexity, and the number of required acceptance tests. For smaller projects with a few systems, testing can often be completed in a few hours to a full day. Larger facilities—such as multi-tenant buildings, hospitals, laboratories, or projects with multiple control sequences—may require one to several days to complete all required verifications.

Timing also depends on site readiness. When systems are fully installed, powered, commissioned, and accessible, testing proceeds efficiently. If corrections are needed during testing, additional time may be required to make adjustments and re-verify results. Clear scheduling and preparation help ensure Title 24 testing is completed as quickly and accurately as possible.